October 13, 2026

Flower German Tolling AB (publ) Acquires 100 MW Battery Storage Project in Germany

Flower German Tolling AB (publ) (“German Tolling”) has, through its wholly owned subsidiary Blitz D26-52 GmbH (to be renamed Flower BESS Germany GmbH), acquired the 100 MW / 400 MWh Bergedorf battery energy storage project in Hamburg, Germany.

Flower German Tolling AB (publ) Acquires 100 MW Battery Storage Project in Germany

The acquisition was completed through the purchase of all shares in Flower Infrastructure Technologies Germany GmbH, which owns the project company FIT Bergedorf Energy Storage GmbH.

The seller is Flower Tolling HoldCo AB, a subsidiary of Flower Infrastructure Technologies Midco AB (publ).

The transaction was completed on 13 October, 2026. The total consideration amounted to SEK 217.5 million and was paid in cash, financed with funds released from the escrow account under German Tolling’s bond loan (ISIN SE0029502657).

Legal disclaimer

This information is information that Flower is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the contact person set out above, at 10.30 CE[S]T on 13 October, 2026.

Kontakter

Om Flower German Tolling AB (publ)

Flower German Tolling AB (publ) is a wholly owned subsidiary of Flower Infrastructure Technologies AB (“Flower”). Flower is the Nordic market leader in energy asset optimization and trading. Through its AI-powered platform, the company trades, optimizes and commercializes flexible energy assets including battery energy storage systems (BESS), wind and solar parks, and EV charging infrastructure. With more than 140 employees, over €200 million in total financial backing, and the Nordics’ largest portfolio of flexible assets under management, Flower is expanding across Europe to support a more stable, resilient, and renewable energy system.

Learn more at flower.se.

Bilagor